The implementation of the 87 kw system has been completed in Al-Sorab Omdurman locality.

The System Consists of:

  • 195 panels with a capacity of mono perc half cut 450w that work with the feature of light dispersion, and work even in cloudy weather with a 25-year guarantee.
  • The used inverter is a 75kw sanch with a full one year warranty.
  • The company provides technical support for a full year free of charge after installing the system.
  • The drilling site and routing of the bearings were determined using the total station by the engineer BarRy JaFer
  • The correct orientation and the optimal tilt of the panels were taken into account
  • DC Cables were used in the electrical wiring
  • The mc4 was used to reduce the losses in connecting the panels