- mono perc half cut panels that work with the feature of light dispersion, and work even in cloudy weather with a 25-year guarantee.
- The inverter comes with a full one year warranty.
- The company provides technical support for a full year, free of charge, after installing the system.
- The points of concrete bases and survey work for the project were signed by the engineer, BarRy JaFer, who specializes in surveying works and concrete bases.
- The correct orientation and optimal inclination of the panels were taken into account.
- DC cables were used in the electrical installations.
- The mc4 was used to reduce losses in connecting panels.
- The required programming was set. For the inverter device, taking into account the method and specific operating conditions of the pump to operate at the highest possible efficiency.
the implementation of a solar energy system has been completed to operate a surface pump of 75 hp in the Atbara River area, in addition to the supply and installation of a 55 kw motor.